Priority-Based Heuristics for the Multi-Skill Resource Constrained Project Scheduling Problem

Isabel Cristina Silva Correia, Francisco Saldanha-da-Gama, B.F. Almeida

Research output: Contribution to journalArticlepeer-review

75 Citations (Scopus)

Abstract

In this paper we investigate one of the most recent extensions of the Resource Constrained Project Scheduling Problem (RCPSP): the Multi-Skill Resource Constrained Project Scheduling Problem (MSRCPSP). For this complex problem we propose the use of a parallel scheduling scheme. Such scheme has been successfully applied to the RCPSP. Nevertheless, in order to apply it to the MSRCPSP two new concepts are developed: resource weight and activity grouping. We discuss such concepts and use them for the new heuristic framework proposed. A series of computational tests performed using a large number of instances and reported in this paper shows that the new heuristic is very effective in finding high quality solutions within very small CPU times. © 2016 Elsevier Ltd. All rights reserved.
Original languageEnglish
Pages (from-to)91-103
JournalExpert Systems with Applications
Volume57
DOIs
Publication statusPublished - 2016

Keywords

  • Activity grouping
  • Multi-skilled resources
  • Parallel scheduling heuristic
  • Project scheduling
  • Resource weight