TY - GEN
T1 - Experimental Analysis of Column To Column Connections for Precast Concrete Truss
T2 - fib Symposium 2016. Performance-based approaches for concrete structures
AU - Souza, Sueli
AU - Lúcio, Válter
AU - Chastre, Carlos
AU - Souza, Luiz
AU - Martins, David
N1 - Sem PDF.
PY - 2016
Y1 - 2016
N2 - The wind energy production is a growing industry and the energy produced is renewable and environmentally cleaner than most of the other systems. The towers to support the wind energy generators may be built with precast concrete elements that are competitive in comparison to other structural systems. The evolution of the technology for wind energy production shows a clear need for larger wind turbines and longer blades and, consequently, taller towers, where precast concrete solutions are competitive. Truss precast concrete towers is a solution that complies with the demands of the present and future wind energy production. The research on the execution and structural behaviour of the connections between the tower elements is an important issue. This communication presents the experimental analysis of column to column connections for precast concrete towers. The tests included connections with commercial threaded bars welded to the rebars and connections with grouted corrugated steel sleeves. Thick joints (50 mm) filled with fibre reinforced grout and thin joints (3 mm) filled with epoxy resin were tested and analysed.
AB - The wind energy production is a growing industry and the energy produced is renewable and environmentally cleaner than most of the other systems. The towers to support the wind energy generators may be built with precast concrete elements that are competitive in comparison to other structural systems. The evolution of the technology for wind energy production shows a clear need for larger wind turbines and longer blades and, consequently, taller towers, where precast concrete solutions are competitive. Truss precast concrete towers is a solution that complies with the demands of the present and future wind energy production. The research on the execution and structural behaviour of the connections between the tower elements is an important issue. This communication presents the experimental analysis of column to column connections for precast concrete towers. The tests included connections with commercial threaded bars welded to the rebars and connections with grouted corrugated steel sleeves. Thick joints (50 mm) filled with fibre reinforced grout and thin joints (3 mm) filled with epoxy resin were tested and analysed.
KW - Precast concrete structures, structural connections, concrete towers
M3 - Other contribution
CY - Cape Town, South Africa
ER -