Onshore wind and solar-photovoltaic-based electricity are expected to drive most of the global growth in renewable energy sources capacity until 2020. This creates a challenge for properly modelling such intermittent variable resources since: (i) their availability varies spatially and temporally and (ii) thus, their integration in power systems is determined by the configuration of transmission grids. Large energy system models usually adopt simplified approaches for modelling wind and solar photovoltaic (PV) deployment and the power grid. This paper uses the recently developed TIMES-Brazil optimisation model to study the role of transmission bottlenecks in cost-effective long-term deployment of wind and solar power in the Brazilian energy system up to 2050. The model explicitly models the grid infrastructure of 29 regions in Brazil differentiated according to existing power plants, wind and solar availabilities, future RES potentials and power demand. Three different scenarios (Free Trade, Simplified Trade and Detailed Trade), with increasingly more detail in modelling electricity transmission lines, were tested. Findings show that a more detailed transmission infrastructure significantly affects capacity deployments and electricity prices. The grid connecting the North and South of Brazil was found to be the most important bottleneck affecting the deployment of solar in the country.

Original languageEnglish
Pages (from-to)791-803
Number of pages13
JournalEnergy
Volume167
DOIs
Publication statusPublished - 15 Jan 2019

Fingerprint

Electricity
Availability
Solar energy
Wind power
Electric lines
Power plants
Costs

Cite this

@article{46bafd7d67394577a081ae5b2de466ef,
title = "Adding detailed transmission constraints to a long-term integrated assessment model – A case study for Brazil using the TIMES model",
abstract = "Onshore wind and solar-photovoltaic-based electricity are expected to drive most of the global growth in renewable energy sources capacity until 2020. This creates a challenge for properly modelling such intermittent variable resources since: (i) their availability varies spatially and temporally and (ii) thus, their integration in power systems is determined by the configuration of transmission grids. Large energy system models usually adopt simplified approaches for modelling wind and solar photovoltaic (PV) deployment and the power grid. This paper uses the recently developed TIMES-Brazil optimisation model to study the role of transmission bottlenecks in cost-effective long-term deployment of wind and solar power in the Brazilian energy system up to 2050. The model explicitly models the grid infrastructure of 29 regions in Brazil differentiated according to existing power plants, wind and solar availabilities, future RES potentials and power demand. Three different scenarios (Free Trade, Simplified Trade and Detailed Trade), with increasingly more detail in modelling electricity transmission lines, were tested. Findings show that a more detailed transmission infrastructure significantly affects capacity deployments and electricity prices. The grid connecting the North and South of Brazil was found to be the most important bottleneck affecting the deployment of solar in the country.",
author = "Raul Miranda and Sofia Sim{\~o}es and Alexandre Szklo and Roberto Schaeffer",
note = "We thank the Brazilian Federal agencies CAPES (Coordenacao de Aperfeicoamento de Pessoal de Nivel Superior) and CNPq (Conselho Nacional de Desenvolvimento Cientifico e Tecnologico) for their support for the scientific research performed at the Energy Planning Program, Universidade Federal do Rio de Janeiro. We would also like to thank the European Commission for their support to the scientific research performed jointly by the Energy Planning Program and the Center for Environmental and Sustainability Research.",
year = "2019",
month = "1",
day = "15",
doi = "10.1016/j.energy.2018.11.036",
language = "English",
volume = "167",
pages = "791--803",
journal = "Energy",
issn = "0360-5442",
publisher = "Elsevier Science B.V., Amsterdam.",

}

Adding detailed transmission constraints to a long-term integrated assessment model – A case study for Brazil using the TIMES model. / Miranda, Raul; Simões, Sofia; Szklo, Alexandre; Schaeffer, Roberto.

In: Energy, Vol. 167, 15.01.2019, p. 791-803.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Adding detailed transmission constraints to a long-term integrated assessment model – A case study for Brazil using the TIMES model

AU - Miranda, Raul

AU - Simões, Sofia

AU - Szklo, Alexandre

AU - Schaeffer, Roberto

N1 - We thank the Brazilian Federal agencies CAPES (Coordenacao de Aperfeicoamento de Pessoal de Nivel Superior) and CNPq (Conselho Nacional de Desenvolvimento Cientifico e Tecnologico) for their support for the scientific research performed at the Energy Planning Program, Universidade Federal do Rio de Janeiro. We would also like to thank the European Commission for their support to the scientific research performed jointly by the Energy Planning Program and the Center for Environmental and Sustainability Research.

PY - 2019/1/15

Y1 - 2019/1/15

N2 - Onshore wind and solar-photovoltaic-based electricity are expected to drive most of the global growth in renewable energy sources capacity until 2020. This creates a challenge for properly modelling such intermittent variable resources since: (i) their availability varies spatially and temporally and (ii) thus, their integration in power systems is determined by the configuration of transmission grids. Large energy system models usually adopt simplified approaches for modelling wind and solar photovoltaic (PV) deployment and the power grid. This paper uses the recently developed TIMES-Brazil optimisation model to study the role of transmission bottlenecks in cost-effective long-term deployment of wind and solar power in the Brazilian energy system up to 2050. The model explicitly models the grid infrastructure of 29 regions in Brazil differentiated according to existing power plants, wind and solar availabilities, future RES potentials and power demand. Three different scenarios (Free Trade, Simplified Trade and Detailed Trade), with increasingly more detail in modelling electricity transmission lines, were tested. Findings show that a more detailed transmission infrastructure significantly affects capacity deployments and electricity prices. The grid connecting the North and South of Brazil was found to be the most important bottleneck affecting the deployment of solar in the country.

AB - Onshore wind and solar-photovoltaic-based electricity are expected to drive most of the global growth in renewable energy sources capacity until 2020. This creates a challenge for properly modelling such intermittent variable resources since: (i) their availability varies spatially and temporally and (ii) thus, their integration in power systems is determined by the configuration of transmission grids. Large energy system models usually adopt simplified approaches for modelling wind and solar photovoltaic (PV) deployment and the power grid. This paper uses the recently developed TIMES-Brazil optimisation model to study the role of transmission bottlenecks in cost-effective long-term deployment of wind and solar power in the Brazilian energy system up to 2050. The model explicitly models the grid infrastructure of 29 regions in Brazil differentiated according to existing power plants, wind and solar availabilities, future RES potentials and power demand. Three different scenarios (Free Trade, Simplified Trade and Detailed Trade), with increasingly more detail in modelling electricity transmission lines, were tested. Findings show that a more detailed transmission infrastructure significantly affects capacity deployments and electricity prices. The grid connecting the North and South of Brazil was found to be the most important bottleneck affecting the deployment of solar in the country.

UR - http://www.scopus.com/inward/record.url?scp=85057140546&partnerID=8YFLogxK

U2 - 10.1016/j.energy.2018.11.036

DO - 10.1016/j.energy.2018.11.036

M3 - Article

VL - 167

SP - 791

EP - 803

JO - Energy

JF - Energy

SN - 0360-5442

ER -