A Time and Space Framework for Overhead Grid Maintenance Optimisation

Research output: Contribution to journalArticlepeer-review

Abstract

This article introduces a framework for the optimisation of high-voltage grid maintenance combining data from project, asset management, inspection, remedial actions and audits. This framework is based on geo-referenced and time-changing databases and probabilistic models for asset condition and risk management.
Original languageUnknown
Pages (from-to)95-99
JournalModern Energy Review
Volume2
Issue number1
Publication statusPublished - 1 Jan 2010

Cite this