Abstract
This paper is concerned with the smoothing of start-up adaptation transients when controlling a priori unknown plants with an adaptive predictive control algorithm. The MUSMAR algorithm embodying an adaptive predictive controller relying on multiple models is considered. The approach followed consists of a dual modification of MUSMAR, including a bicriterial optimization which takes into account both the control objective and the parameter estimation criteria. The advantages of the proposed algorithm in what concerns reduction of the start-up adaptation transient are illustrated by experimental results obtained for the temperature control of a distributed solar collector energy plant.
Original language | English |
---|---|
Pages (from-to) | 877-883 |
Number of pages | 7 |
Journal | IEEE Transactions on Control Systems Technology |
Volume | 13 |
Issue number | 6 |
DOIs | |
Publication status | Published - 1 Nov 2005 |
Keywords
- Adaptive control
- Dual control
- Predictive control
- Solar energy